国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Booth Setup & Dismantlement

2015-07-10

1. Dates & Time for Booth Set-up & Dismantlement

Booth Setup: Sept 12-16, 2015

- Sept 12-15: 08:30-18:00

- Sept 16: 08:30-24:00 (Halls close at 24:00 for security check)

Booth Dismantlement:

- Sept 21: 17:30-24:00

- Sept 22: 08:30-18:00

2. Regulations and Rules on Booth Setup & Dismantlement

1) The contracting company that needs to set up customer-built booths shall provide the Exhibition Administration & Customer Service Center with the materials and documents as stipulated in the China-ASEAN Expo Requirement for Customer-built Booths, along with the Safety Guarantee Note before August 25th. (Tel: +86-771-5813018, Fax: +86-771-5813130)

2) The custom-built booth project must not block or cover the lighting boxes, power boxes or telephone distribution boxes. Should it need to block the above facilities, applications should be submitted to the Exhibition Administration & Customer Service Center, and a 0.6m-wide passage must be spared for entry and exit, and a sufficient distance that enables the safe opening of these boxes must be left for the sound operation of these facilities.

3) The maximum load of the booth shall be within the bearing capacity of the exhibition halls. The vertical projection of the exhibits and the decorative articles shall not exceed your booth. The maximum height of the booth decoration is 6.5m, and those that are higher than 4.5m should be less than 2/3 of the total area of the booth (Note: the maximum height of the decorations of booths against walls in Hall 1-15 shall not exceed 4.5m).

4) Exhibitors are not allowed to dismantle, amend, destroy or deface the existing buildings or all permanent facilities without approval. The floor and walls as well as the wall panels of shell schemes may not be nailed or holed. For moving exhibits and equipment inside the exhibition halls, pushcarts with rubber or nylon wheels are requested.

5) Exhibitors may not move the in-booth facilities or electrical appliances out of their booths without approval.

6) After the conclusion of the CAEXPO, all people shall leave the exhibition halls. Upon security check, exhibitors with a valid Pass for booth dismantlement may enter the exhibition halls. (Note: During security check period, one staff member of each exhibiting company can remain at the booth to take care of exhibits. But he/she will be asked to leave the halls, if he/she doesn’t stay at his/her booth.)

7) The Exhibition Administration & Customer Service Center is the supervisor of booth construction of the CAEXPO, and will inspect and monitor the whole process of construction and punish to those who violate the rules and regulations.

大竹县| 抚宁县| 嘉禾县| 宜阳县| 靖江市| 客服| 东兴市| 奉化市| 张掖市| 泰和县| 彰化县| 长葛市| 云林县| 惠安县| 屏东县| 东至县| 聂荣县| 锡林郭勒盟| 精河县| 界首市| 连州市| 且末县| 阿荣旗| 禹州市| 林芝县| 霸州市| 洞口县| 贵定县| 彭水| 沁源县| 含山县| 固始县| 桑日县| 阿勒泰市| 万安县| 滕州市| 保康县| 大冶市| 兴山县| 洛宁县| 德化县|