国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Global EditionASIA 中文雙語Fran?ais
Business
Home / Business / Industries

CNNC sticks to highest security standard

By Zheng Xin | China Daily | Updated: 2018-02-13 10:02
Share
Share - WeChat
The Sanmen nuclear power plant, which was under construction in Sanmen, Zhejiang province. [Photo/Xinhua]

China National Nuclear Corp has said that fuel loading delays at the first AP1000 reactor in the Sanmen nuclear power plant in Zhejiang province are due to security concerns and the nuclear power producer expects to complete the same later this year.

The Sanmen unit one is well prepared for fuel loading and the delay is because China wants to ensure that the nuclear plant meets the highest security standards, said Pan Jianming, a spokesman for the CNNC.

The CNNC is a major nuclear power player in terms of investment, operation, and development in the nuclear sector in China.

A comprehensive nuclear safety check was completed last year at the AP1000 reactor at unit one of the Sanmen nuclear power plant in Zhejiang province. Fuel loading is expected to take place later but has been suspended for now. There are no details still on when the fuel loading will be carried out.

According to Joseph Jacobelli, a senior analyst of Asian utilities at Bloomberg Intelligence in Hong Kong, the long expected fuel loading has been suspended due to security concerns.

"The China power industry usually delivers power plants on time or ahead of schedule," he said. "The exceptions are hydro power plants which occasionally meet logistical challenges and nuclear power plants which sometimes are delayed to ensure everything is safe. We do not find such delays worrying because we think that the overall trajectory is still the same, namely a sharp rise in nuclear power capacity in China," he said.

China plans to boost nonpolluting power's role in the country's energy mix. Installed nuclear capacity, which more than doubled to 27.17 GW during the 12th Five-Year Plan (2011-15), is expected to double again by 2020 to 58 GW, according to the country's energy authority.

"The installed capacity could increase tenfold between 2016-50, namely to 303-347 GW by 2050 from 34 GW in 2016, accounting for almost 18 percent of output from about 4 percent," said Jacobelli.

Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
CLOSE
 
宜春市| 正宁县| 辽宁省| 扬中市| 永兴县| 蕉岭县| 鹤壁市| 乌兰察布市| 吉水县| 龙泉市| 贵德县| 犍为县| 十堰市| 喀喇沁旗| 乌恰县| 德庆县| 霍山县| 阿合奇县| 会东县| 宁城县| 丰都县| 鄂托克前旗| 满洲里市| 什邡市| 丹阳市| 江安县| 绥中县| 衡阳市| 任丘市| 郧西县| 剑阁县| 通州区| 淅川县| 孟村| 永定县| 临夏县| 榆社县| 商城县| 平凉市| 江都市| 治县。|