国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Global EditionASIA 中文雙語Fran?ais
China
Home / China / Society

Northeast bullet train section begins trial runs

By Wu Yong in Shenyang | China Daily | Updated: 2018-03-02 08:17
Share
Share - WeChat

Line linking Beijing, Shenyang to cut travel time nearly in half

The Liaoning section of the Beijing-Shenyang high-speed railway began its first trial run on Thursday morning, testing the line's power supply equipment, according to project officials.

The railway linking Beijing and Shenyang, Liaoning province, is about 700 kilometers long, and trains will run at speeds of up to 350 kilometers per hour. The line will cut travel time between Beijing and Shenyang from 4.5 hours to 2.5 hours.

The project, which costs 124.5 billion yuan ($20.4 billion), was launched in July 2014 as part of the Beijing-Harbin high-speed railway. It is considered a vital link connecting Beijing with Northeast China.

It is also the only part of China's high-speed rail network - comprising four north-south lines and four east-west lines - that remains unfinished.

Zhang Yuehan, senior engineer of the Shenyang railway bureau's planning and statistics department, said the line would smooth transportation between Beijing and Heilongjiang, Jilin and Liaoning provinces.

"The Beijing-Shenyang line will become the fastest access to the northeastern region, as the entire northeastern railway network will be interconnected with the national high-speed railway network and thus form an efficient and convenient rapid transport network," Zhang said.

Wang Min, who works for an import-export company in Shenyang said, "With the new train, I can go to Beijing in the morning, visit clients and return home at night. It will save me both money and time."

Besides its economic benefits, the project has developed more than 70 types of new technologies and equipment to ensure high quality across the system, according to Wang Zhipeng, chief of Beijing-Shenyang HSR Liaoning Co.

For example, new track plates with sensors can provide real-time monitoring. Also, 500-meter-long rail sections will reduce maintenance and improve passenger comfort.

Tests of the Liaoning section are expected to be completed in the second half of this year. Workers need to inspect all systems, including rails, bridges, electrical systems and signals. The line's section in Hebei province will also be tested.

Zhu Lin contributed to this story.

wuyong@chinadaily.com.cn

Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
库尔勒市| 汤阴县| 清新县| 翁源县| 新田县| 仙桃市| 开平市| 长宁区| 两当县| 休宁县| 通许县| 称多县| 翁源县| 图木舒克市| 江城| 惠东县| 东丽区| 巴东县| 乐亭县| 弋阳县| 辽宁省| 中宁县| 兴山县| 景洪市| 台安县| 广安市| 靖州| 汤阴县| 徐闻县| 青铜峡市| 灵丘县| 辰溪县| 普兰县| 吐鲁番市| 克什克腾旗| 安顺市| 棋牌| 庐江县| 田林县| 巫山县| 金塔县|