国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Eight things you need to know about Hong Kong-Zhuhai-Macao Bridge

By He Shusi | chinadaily.com.cn | Updated: 2018-10-23 15:14
Share
Share - WeChat
The bridge seen during construction in November 2017. [Photo by ROY LIU/CHINA DAILY]

6. When did construction start? What was the cost?

The plan to build a link road across the Pearl River Estuary was first initiated by Hong Kong industrialist Gordon Wu Ying-sheung in 1983. After several twists and turns, the Feasibility Study started in March 2004 under State Council's approval. The study report was approved in October 2009, followed by a commencement ceremony on Dec 15 in the same year, chaired by then-vice-premier Li Keqiang in Zhuhai.

So far, the total cost of HZMB is about 120 billion yuan ($17.4 billion), of which the 29.6-km Main Bridge invested by three governments is about 48.1 billion yuan. The rest are investments by individual governments on their ports and link roads to the Main Bridge.

The cost allocation among the three governments shown as above is settled by the assessment of economic benefits they can get after the bridge opens.

|<< Previous 1 2 3 4 5 6 7 8 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
松滋市| 荥阳市| 休宁县| 东山县| 涞水县| 鲁甸县| 江阴市| 隆子县| 五莲县| 宁城县| 赫章县| 庆元县| 昌江| 资兴市| 芮城县| 喜德县| 安达市| 曲靖市| 嫩江县| 呈贡县| 清水河县| 苍梧县| 汤原县| 宝兴县| 隆尧县| 广昌县| 荥经县| 海兴县| 重庆市| 大兴区| 万年县| 五指山市| 天津市| 杨浦区| 奉新县| 武隆县| 玉龙| 同江市| 南昌县| 浏阳市| 万源市|