国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Global EditionASIA 中文雙語Fran?ais
China
Home / China / Innovation

Cold functional test starts at China's first Hualong One nuclear project

Xinhua | Updated: 2019-04-27 20:13
Share
Share - WeChat

FUZHOU -- Cold functional tests began Saturday on a reactor of China's first nuclear power project using Hualong One technology, a domestically developed third-generation reactor design.

The test was conducted on a circuit of the No. 5 nuclear power unit in the city of Fuqing, eastern China's Fujian Province, to evaluate the performance of the circuit system and its supporting facilities under high-pressure conditions, according to the China National Nuclear Corporation (CNNC).

The CNNC said the test started 50 days ahead of schedule.

Hualong One reactors were jointly designed by two nuclear power giants, China General Nuclear Power Group and the CNNC, and passed inspection by a national panel in August 2014.

China has since approved the use of Hualong One technology to build two reactors in Fujian, the No. 5 and No. 6 units.

Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
民和| 永顺县| 左贡县| 聂拉木县| 娄底市| 明光市| 花莲县| 贵定县| 来安县| 九寨沟县| 丰城市| 墨脱县| 沭阳县| 小金县| 奉贤区| 江北区| 长治县| 石首市| 花莲市| 瑞安市| 大理市| 文成县| 怀化市| 黄大仙区| 磐安县| 信宜市| 旬阳县| 溧阳市| 青州市| 宁强县| 历史| 溧阳市| 肥西县| 邹城市| 长宁县| 盐池县| 游戏| 扎赉特旗| 栖霞市| 沾化县| 成武县|