国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Global EditionASIA 中文雙語(yǔ)Fran?ais
Business
Home / Business / Industries

Universal Beijing Resort starts formal operation

Xinhua | Updated: 2021-09-20 16:31
Share
Share - WeChat
Tourists visit the Wizarding World of Harry Potter at the Universal Beijing Resort in Beijing, Sept 20, 2021. The Universal Beijing Resort, currently the largest in scale worldwide, opened to the public on Monday. [Photo/Xinhua]

ANCIENT CAPITAL MEETS MODERN RESORT

Relying on world-renowned Intellectual Properties such as Transformers, Minions, Harry Potter and Jurassic World, the Universal Beijing Resort attracted tens of thousands of tourists during the trial operation in early September.

Of the resort's seven theme lands, Kung Fu Panda Land of Awesomeness, Transformers Metrobase and WaterWorld are specially set up for Chinese tourists.

"We take full consideration of the actual needs and cultural preferences of Chinese consumers," said Tom Mehrmann, president and general manager of Beijing International Resort Co Ltd Theme Park and Resort Management Branch.

In addition to Chinese cultural elements, "made-in-China" also shines in the resort. The construction of the Universal Beijing Resort has made use of a large amount of Chinese-made equipment, displaying the strength of China's manufacturing industry.

Walking into the theme land of Jurassic World Isla Nublar, visitors see a rockery standing tall and spring water falling from a height of 50 meters, bringing to mind scenes from a film.

"This giant rockery was built with more than 10,000 steel components by Chinese engineers through computer control and modular construction," said Shen Shuaishuai, with the China Construction Second Bureau Installation Engineering Co Ltd, one of the resort's construction contractors.

More Chinese high-end technologies such as big data, artificial intelligence, cloud computing, 3D scanning, 3D printing, and modern surveying and mapping technology have also been widely applied in the construction process.

"The construction took just two and a half years. The use of Chinese high-end technologies has greatly shortened the construction period," said Wang Tayi, general manager of Beijing International Resort Co Ltd.

Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
CLOSE
 
鹤峰县| 景洪市| 资兴市| 慈溪市| 湾仔区| 莱芜市| 行唐县| 怀化市| 泽州县| 中方县| 台中市| 濉溪县| 康定县| 军事| 当阳市| 同心县| 海安县| 汕头市| 镇沅| 洪泽县| 北海市| 横山县| 阳城县| 象山县| 电白县| 盐津县| 乌苏市| 孝义市| 蛟河市| 永安市| 峡江县| 方城县| 双牌县| 龙州县| 元谋县| 黄陵县| 西宁市| 灵武市| 六盘水市| 太保市| 海原县|