国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Global EditionASIA 中文雙語Fran?ais
China
Home / China / Hong Kong

Repair works: HK expects new code of practice next week

By Shamim Ashraf in Hong Kong | China Daily | Updated: 2025-12-04 22:15
Share
Share - WeChat
This Nov 28, 2025, photo shows green mesh netting used for renovation of the Wang Fuk Court buildings in Tai Po, Hong Kong. [PARKER ZHENG / CHINA DAILY]

The Buildings Department of Hong Kong aims to issue a new code of practice on building repair works next week, requiring all scaffold net materials to be sampled on site, in light of an investigation into the deadly Tai Po fire.

The scaffold nets can only be installed after being certified by designated laboratories as compliant with relevant requirements, said the department.

The move comes following last week's fatal fire that tore through seven of the eight buildings of Wang Fuk Court, leaving at least 159 people dead. Preliminary investigations suggest that substandard protective mesh netting around the buildings may have contributed to the fire's rapid spread.

LIVE UPDATES: Tai Po fire

The BD has taken samples from 398 private buildings with scaffold nets installed and sent them for testing in batches, as of Wednesday.

Apart from the two buildings where plastic sheeting was found blocking the windows, which have already been removed, the department did not find other buildings that used foam boards or plastic sheeting to block windows.

Government departments responsible for inspections of relevant projects will promptly contact the relevant contractors, instructing them to complete the removal before Saturday.

For individual cases where removal cannot be completed within that timeframe, the responsible party must notify the relevant department in advance, which will assess whether there are reasonable grounds for discretionary arrangements, said the government.

The Labour Department has inspected 175 construction sites, issued 92 written warnings and 49 improvement notices, and has taken out 13 prosecutions, as at 4 pm Wednesday.

RELATED ARTICLES

HK blaze probe finds substandard netting

Judge to head committee probing Tai Po fire disaster

HK fire relief work progresses as donations pour in

Housing Bureau suspends third building project over plastic sheeting

The Architectural Services Department has inspected all 18 of its public works building projects and collected samples for testing.

The Independent Checking Unit (ICU) of the Housing Bureau separately deployed a dedicated team to Fung Wah Estate in Chai Wan under the Tenants Purchase Scheme and Yee Kok Court in Sham Shui Po under the Home Ownership Scheme (HOS) on Wednesday to collect samples of the protective nets on site.

The registered contractors of the four HOS courts – Sui Wo Court in Sha Tin, Ching Lai Court in Sham Shui Po, Yee Kok Court in Sham Shui Po, and On Kay Court in Kwun Tong – have been dismantling the protective nets in the respective HOS courts.

The contractor of Fung Wah Estate in Chai Wan also started removing the protective nets.

On public housing estates, currently 15 housing estates are conducting maintenance works in relatively larger and localized areas with protective nets. The removal of all the protective nets will take place and is expected to be completed by Thursday.

Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
宜兰市| 闵行区| 房产| 德令哈市| 达孜县| 信丰县| 健康| 灵宝市| 额济纳旗| 丹寨县| 宁安市| 南华县| 界首市| 楚雄市| 敦化市| 昭通市| 阿拉善盟| 民丰县| 寿光市| 洛南县| 宝丰县| 于田县| 阳高县| 弥渡县| 永州市| 那曲县| 沽源县| 芜湖市| 赤壁市| 瓮安县| 伊宁市| 开鲁县| 金门县| 登封市| 茂名市| 加查县| 扎鲁特旗| 巴彦县| 莲花县| 潮州市| 新邵县|