国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Global EditionASIA 中文雙語(yǔ)Fran?ais
China
Home / China / Society

Shanghai East Railway Station completes 9,000-ton steel roof lift

By Zheng Zheng in Shanghai | chinadaily.com.cn | Updated: 2026-05-14 17:07
Share
Share - WeChat

A 9,000-ton steel structural roof truss was lifted 13.5 meters into position at Shanghai East Railway Station on Thursday, marking a milestone in the project with construction now moving to metal roofing installation.

The 14-hour installation was the largest single roof section ever lifted at a Chinese railway station, covering 74,000 square meters, equivalent to 176 basketball courts.

The roof employs a double-curved spatial truss grid system. Upon completion, the entire roof structure will span 390 meters east-west and 335 meters north-south, covering a total area of 113,000 square meters through 119 diamond-shaped units.

A 9,000-ton steel structural roof truss is lifted 13.5 meters into position at Shanghai East Railway Station. [Photo by Gao Erqiang/chinadaily.com.cn]
1 2 3 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
波密县| 桐柏县| 宿迁市| 文安县| 斗六市| 麻城市| 商都县| 陆良县| 望奎县| 宕昌县| 上犹县| 洛扎县| 聊城市| 洱源县| 淮北市| 贵阳市| 朔州市| 石城县| 塔城市| 丹东市| 浦县| 博客| 同江市| 兴安县| 楚雄市| 门源| 厦门市| 西林县| 苗栗县| 普兰店市| 许昌市| 米易县| 太白县| 贵南县| 察哈| 平陆县| 永康市| 龙海市| 江津市| 乡城县| 大英县|