国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

   

Beijing completes track construction of airport rail

(Xinhua)
Updated: 2007-11-07 10:32

The Beijing rail management company announced on Tuesday that it has completed laying the tracks on an express rail between the downtown area and Beijing Capital International Airport.

The 28-km light rail runs from Dongzhimen, on the northeast corner of the second ring road which encircles downtown Beijing, to the airport in the northeast suburbs.

Sources with the company said they would test run trains on the rails, and continue with installing electricity, signal and telecommunications equipment.

Passengers bound for the airport can get boarding passes and check in luggage at the Dongzhimen station and only have to go through security checks at the airport before taking off.

The railway, with four stops at Dongzhimen, Sanyuan Bridge and two terminals (T2 and T3) of the airport, will be in operation before the Olympics in August 2008.

The rail's highest speed will be 110 km per hour, making the journey from Dongzhimen to the airport to about 16 minutes.

Beijing, with a population of 17 million, had 3.08 million registered motor vehicles as of August. It has implemented a slew of measures, including slashing bus fares, metro ticket prices and improving public transit infrastructure to ease traffic pressure and improve air quality ahead of the Olympics.

Beijing has five existing rail lines, extending 141 kilometers. The newest, the No. 5 line, runs through the heart of Beijing from north to south. The city will have nine lines totaling 200 km by 2008, and 19 lines totaling 561.5 km by 2020.


(For more biz stories, please visit Industry Updates)



Related Stories  
新田县| 交城县| 苏尼特右旗| 威远县| 江孜县| 鹤壁市| 宜黄县| 彭水| 百色市| 内黄县| 东乡族自治县| 彭州市| 昌乐县| 民勤县| 庆云县| 运城市| 株洲县| 汤原县| 澄城县| 牙克石市| 曲麻莱县| 蕉岭县| 南郑县| 凌海市| 龙里县| 乌兰县| 财经| 秭归县| 梁河县| 星座| 星子县| 广宁县| 凤凰县| 阿图什市| 姜堰市| 东明县| 辉县市| 贵定县| 荣昌县| 祁连县| SHOW|