国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

   

New subway lines start construction in Beijing

(Xinhua)
Updated: 2007-12-08 18:41

The five will all be completed by 2015.

Line 10 starts from Wulu station in western Haidian district and ends in Dongxiaoying in eastern Tongzhou district. It is 41.74 kilometers long with 27 stops.

The second phase of Line 8 will extend the first phase, called the 4.5-km Olympic line, northward and southward separately. The two extensions are 17.46 km long with 12 stops.

Line 10, which is 32.46 km long and has 23 stops, is the second circular line outside the current operational Line 2. The 24.55 km-long first phase of Line 10 started in 2003.

The Yizhuang line is 23.2 km long and has 14 stops. The 22.2-km-long Daxing has 11 stops.

Currently, the first phase of Line 10, Line 8 and a 28-km line linking downtown to Beijing Capital International Airport are under construction.

Line 10, the Olympic line and the airport line will be put into operation before next August's Olympic Games in Beijing.

Currently, the capital has Line 1, Line 2, Line 5, Line 13 and the Batong line in operation carrying about 2.3 million passengers each day. Their combined length is 142 kilometers. The city plans to have 561 kilometers of rail lines by 2015, carrying nine million passengers daily. There are currently 1.2 million private cars on Beijing's roads, and about 1,000 new autos appear on the city's streets each day. The city's population has grown from 12.77 million in 2000 to an estimated 17 million now.


(For more biz stories, please visit Industry Updates)

   1 2   


Related Stories  
太和县| 深水埗区| 介休市| 西林县| 寻乌县| 芜湖市| 卢龙县| 水富县| 灌云县| 平凉市| 于都县| 曲水县| 浦江县| 会东县| 沈阳市| 株洲市| 察哈| 东山县| 旬邑县| 闻喜县| 长葛市| 苗栗市| 金寨县| 龙川县| 沙雅县| 霸州市| 永春县| 惠州市| 青川县| 麟游县| 额敏县| 扎赉特旗| 全椒县| 鹤壁市| 中山市| 景洪市| 西贡区| 黄骅市| 行唐县| 石楼县| 阜城县|