国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Economy

China's Three Gorges Dam accelerates water discharge

(Xinhua)
Updated: 2011-05-20 17:25
Large Medium Small

BEIJING -- The Three Gorges Dam, the world's largest hydroelectric project, has started to increase its water release to ease severe drought plaguing downstream rice-growing areas on Friday.

From May 20 to 24, the dam will accelerate its discharge rate to 10,000 cubic meters per second, about 3,000 cubic meters faster than its inflow rate, the State Flood Control and Drought Relief Headquarters (SFDH) said in a statement.

The rate will be increased to 11,000 to 12,000 cubic meters per second between May 25 and June 10.

Related readings:
China's Three Gorges Dam accelerates water discharge Projects to ease impact of Three Gorges Dam
China's Three Gorges Dam accelerates water discharge Three Gorges Dam releases water to ease drought
China's Three Gorges Dam accelerates water discharge Three Gorges Dam to unleash water, ease drought
China's Three Gorges Dam accelerates water discharge China's Three Gorges Project to be completed in five years

The dam, whose main body is located in the town of Sandouping in Hubei province, has discharged 17 billion cubic meters of water to areas downstream since the beginning of this year.

Consequently, water levels in the middle and lower reaches of the Yangtze River, China's longest river, have risen by 0.63 meters and 2.12 meters, respectively, from record lows.

Water release lifted the water levels at key sections of the Yangtze River, which effectively helped ensure water supplies in those areas, SFDH said.

During the January-April period, the Yangtze River basin received 40 percent less rainfall than the past 50-year average.

Dwindling water levels in rivers have affected agricultural irrigation capabilities and water supplies for daily living, seriously affecting some parts of Hubei and Hunan provinces.

The Three Gorges Project consists of a dam, a five-tier ship dock and 26 hydropower turbo-generators. The project generates electricity, controls flooding by providing storage space and adjusts shipping capacity.

The project was launched in 1993 with a budget of about $22.5 billion.

分享按鈕
丹巴县| 龙门县| 盘锦市| 苏尼特右旗| 蓬安县| 松桃| 铁力市| 益阳市| 南开区| 衡水市| 正镶白旗| 宝清县| 淮南市| 霍林郭勒市| 鹤岗市| 瓦房店市| 武平县| 武义县| 阜新市| 成安县| 班玛县| 从江县| 惠来县| 博爱县| 巴彦淖尔市| 正阳县| 利辛县| 南部县| 桐柏县| 罗山县| 噶尔县| 深圳市| 蚌埠市| 昌江| 咸宁市| 宁城县| 天柱县| 仙居县| 温泉县| 修武县| 鄂托克旗|