|
CHINA> Regional
![]() |
|
Reports about Sichuan-Tibet railway construction untrue: MOR
(chinadaily.com.cn)
Updated: 2009-09-02 15:04 The Ministry of Railway denied recent media reports that the construction of the Sichuan-Tibet railway will begin this month, according to People Daily’s website people.com.cn. The reports said the ministry would invest an estimated 53.78 billion yuan ($7.86 billion) over eight years in the project. The new train line would have taken just eight hours to travel the 1,629 kilometers between Chengdu and Lhasa.
A number of challenging geographic obstacles stand in the way of the railroad’s construction, including frozen earth, land and rock slides, cold weather and a lack of oxygen due to high-altitudes in some parts. As a result, some experts said the total cost of the railway may reach 100 billion yuan ($14.6 billion). There are currently two ways to get from Chengdu to Lhasa: driving on the Number 318 national highway which takes three days, or taking a train from Chengdu to Shaanxi to Qinghai and finally on to Lhasa, which takes about 45 hours in total. |
|||||||
惠东县| 高州市| 察隅县| 南溪县| 岳阳市| 拜泉县| 罗甸县| 泗水县| 宝鸡市| 舞钢市| 渭源县| 瑞安市| 揭东县| 墨江| 枣庄市| 潼关县| 阜宁县| 湛江市| 夏河县| 陵川县| 广丰县| 什邡市| 和田市| 宣武区| 铁力市| 宜春市| 德保县| 临沧市| 静宁县| 永年县| 西丰县| 潜山县| 湖州市| 莱州市| 华安县| 六安市| 寻乌县| 绍兴县| 宿松县| 阿尔山市| 蒙城县|