国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

China / Government

Draft addresses rail safety

By Xin Dingding (China Daily) Updated: 2012-06-20 01:59

Measures would improve system for contracting

China began to solicit public opinion on railway safety draft regulations that set tighter standards on locomotive parts, signal systems and railway contracts.

The draft, published by the State Council's Legislative Affairs Office on Monday, bans prime contractors from subcontracting railroad projects that involve pillars, beams, rails and protection measures.

In the event of shared projects, prime and sub-contractors would bear joint liability under the draft, which also requires fencing to be installed anywhere a train's speed exceeds 120 kilometers per hour.

Illegal subcontracting played a role in several scandals last year, for example when a former cook was found to have directed other unskilled migrant workers in building a railway bridge in Jilin province.

Yang Hao, a railway expert and professor at Beijing Jiaotong University, said the measure would guard against hiring companies that "have no qualification in railway construction but are able to win bids via wide connections".

After winning contracts, such companies often reap huge profits by subcontracting. If the regulations are adopted, such companies wouldn't have a chance of being awarded a contract, he said.

The draft also requires producers of locomotive switches, signaling equipment, power supplies and safety equipment, to be approved by State authorities.

It would establish the nation's first railway-product recall system.

Producers of locomotive parts would have to suspend production and recall faulty products. If they were found to conceal misconduct or handle the defected products in an inappropriate way, they would be subject to fines and loss of licenses, under the draft.

Faulty equipment has been blamed for a spate of high-speed train incidents that include traffic delays and a fatal crash near the city of Wenzhou in July, 2011, in which a bullet train slammed into a stalled train, leaving 40 people dead.

Yang said that currently, railway products only need administrative approval.

"The examination of products' performance and quality is a mere formality, and is often conducted by parties that share interests with the producers," he said.

Having authoritative third parties to conduct performance tests and quality assurance tests will "help prevent corruption and manipulation", Yang said.

Last year, China CNR Corp, one of the nation's two major train makers, recalled 54 high-speed trains because they reportedly had a higher malfunction rate than allowed by regulation, with a series of power outages and blackouts on the Beijing-Shanghai line in the first month of operations.

The trains were put back into operation at the end of last year after the problems were solved and their quality was approved.

From now to July 18, the public is invited to offer opinions on the draft regulations.

The draft is widely seen as the central government's response to public concern about railway safety, as it includes lessons learned from the deadly Wenzhou train crash.

An extended State Council investigation of the crash concludes there were "serious design flaws" in the control equipment used at Wenzhou South Railway Station.

Those defects were the result of sloppy management. The Ministry of Railways was also found to have violated bidding and technical examination procedures, which allowed flawed equipment to be used at the railway station and on other rail lines.

Contact the writer at xindingding@chinadaily.com.cn

Xinhua contributed to this story.

 

Highlights
Hot Topics
...
基隆市| 平定县| 汶川县| 资源县| 高青县| 石柱| 梅州市| 嘉荫县| 锡林浩特市| 宜黄县| 积石山| 卫辉市| 平山县| 县级市| 临江市| 剑河县| 通州市| 炉霍县| 焉耆| 苏州市| 邻水| 科技| 漳平市| 宾阳县| 青河县| 德兴市| 平乐县| 仲巴县| 奇台县| 北安市| 福清市| 宜黄县| 普宁市| 祁连县| 舟曲县| 南涧| 广宗县| 利川市| 元阳县| 社会| 宝清县|