国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

USEUROPEAFRICAASIA 中文雙語Fran?ais
Home / Comment

Changeover conundrum

By Jiang Xueqing | China Daily | Updated: 2013-09-18 07:49

Opened in 1999, Huaneng Beijing Thermal Power Plant has four coal-fired generation units, which have a combined capacity of 845 megawatts. It provides 10 percent of the electricity consumed in Beijing annually and about 33 percent of the heat supplied to the city's central heating pipe network.

In 2006, when Beijing was applying to host the 2008 Olympic Games, the plant upgraded the desulfurization devices in four boilers, lowering sulfer dioxide emissions from between 400 to 500 milligrams per cubic meter to less than 50 mg. A year later, it modified denitration devices, technology that removes nitrogen oxide from exhaust gases, and reduced nitrogen oxide emissions from 400 mg per cu m to less than 100 mg.

In recent years, PM2.5 levels have become a matter of public concern. As a result, this year, Huaneng Beijing has finished upgrading one of its dust-collection facilities by using a technology currently employed in Japanese coal-fired power plants, which lowered emissions of dust to less than 10 mg per cu m.

Changeover conundrum

Today's Top News

Editor's picks

Most Viewed

Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
麻城市| 景泰县| 汨罗市| 星子县| 交城县| 龙州县| 通州市| 德江县| 绍兴市| 敦煌市| 永春县| 合水县| 会昌县| 易门县| 灯塔市| 浠水县| 甘德县| 蒙城县| 仁怀市| 中超| 闽侯县| 万山特区| 福州市| 都江堰市| 鄂托克旗| 澄江县| 北京市| 舟山市| 永顺县| 洱源县| 定州市| 台安县| 莲花县| 上犹县| 湘阴县| 佛冈县| 曲靖市| 得荣县| 日喀则市| 永靖县| 奇台县|