国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

  .contact us |.about us
Home BizChina Newsphoto Cartoon LanguageTips Metrolife DragonKids SMS Edu
news... ...
             Focus on... ...
   

Dam building won't stop Yangtze shipping - official
( 2001-06-05 11:15 ) (1 )

The State has pledged to take measures to guarantee the flow of cargo while work continues on the Yangtze River Three Gorges Dam project in November next year.

"We will strengthen our management of the temporary lock to ensure that transportation is accommodated during the work," said Wang Jiazhu, deputy general manager of the China Yangtze Three Gorges Project Development Corp.

According to Wang, the lock, which will be the only navigation access along the Yangtze River during the period, is designed to handle shipping with a total dead weight of 9-11 million tons a year.

The work is the next phase of the dam project. A coffer-dam will be built on the current water diversion channel so that workers can construct the last section of the 1,900-metre-long dam on the Yangtze River and build power generators within the coffer-dam.

The current water diversion channel, which was first opened for traffic in 1997 with the first river closure, is the major navigation access at present.

In flood season and other emergencies, Maoping dock, 1.5 kilometres upstream of the dam, helps channel some of the river transport by moving it off the water and onto land, Wang said.

Wang said the temporary lock is expected to be closed, which will completely stop navigation along the Yangtze River, for 67 days in 2003 after the two sections of the dam are connected. It will be closed in order to raise the water level in the reservoir to 135 metres and to put the first four generators into operation.

The shipping suspension period will last from April to June because it is the best season to carry out the work. During this period, the river water flows at more than 12,000 cubic metres per second, forcing the temporary lock to be closed to traffic.

During the suspension period, cargo and passengers will be unloaded from boats and loaded onto road and rail vehicles to bypass the closed section of the Yangtze River.

Wang said that after the completion of the Three Gorges Dam project, the river will be able to accommodate shipping with a dead weight of up to 50 million tons a year, up from the current 10 million tons. Transportation costs are expected to be reduced by 35-37 per cent when the project is finished.

 
   
 
   

 

         
         
       
        .contact us |.about us
  Copyright By chinadaily.com.cn. All rights reserved  
万盛区| 凭祥市| 富锦市| 屏东县| 衡阳市| 雅江县| 漯河市| 会宁县| 资源县| 怀安县| 郧西县| 姚安县| 农安县| 独山县| 临汾市| 武冈市| 昭通市| 东阳市| 绵阳市| 宜兰市| 太谷县| 莱西市| 轮台县| 故城县| 泰兴市| 海阳市| 灵川县| 垫江县| 吉木乃县| 将乐县| 湖南省| 芦山县| 泾川县| 澳门| 荔浦县| 教育| 沁水县| 萝北县| 呼伦贝尔市| 大方县| 兴业县|