国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

  .contact us |.about us
News > Business News ...
Search:
    Advertisement
Major power plant starts construction
( 2003-07-02 09:59) (Xinhua)

Construction on a power plant with a designed capacity of 1.2 million kilowatts, which is listed as a key construction project of the country, began in Xilin Gol of Inner Mongolia Tuesday.

With a total investment of 4.95 billion yuan (US$596 million), the power plant will take three years to be completed. Once in operation, the electric power it generates will be transferred to the north China power network which covers Beijing, Tianjin and Tanggu.

Located about 200 kilometers from Beijing, the power plant, a major power source of the country's gigantic west-to-east power transfer project, will effectively relieve the power shortage in the north. It is also expected to benefit the 2008 Beijing Olympic Games.

 
Close  
   
  Today's Top News   Top Business News
   
+WHO: Bird flu death rises to 15; vaccination recommended
(2004-02-05)
+Solana: EU ready to lift China arms embargo
(2004-02-05)
+Nation tops TV, cell phone, monitor production
(2004-02-05)
+Absence ... still makes China hot
(2004-02-05)
+Hu: Developing world in key role
(2004-02-04)
+KFC: We operate normally in China despite bird flu outbreaks
(2004-02-05)
+Starbucks takes aim at China chain
(2004-02-05)
+Former Microsoft China chief gets new job
(2004-02-05)
+Private airline prepared for take off
(2004-02-05)
+Investors lured by call of siren
(2004-02-05)
   
  Go to Another Section  
     
 
 
     
  Article Tools  
     
 
 
     
   
        .contact us |.about us
  Copyright By chinadaily.com.cn. All rights reserved  
朝阳市| 滕州市| 和顺县| 荔波县| 永丰县| 沙雅县| 会昌县| 商洛市| 丰县| 清涧县| 临泉县| 嘉峪关市| 南靖县| 永宁县| 肇州县| 贞丰县| 襄汾县| 栖霞市| 岑巩县| 棋牌| 东山县| 新津县| 镇巴县| 崇礼县| 东台市| 益阳市| 丹巴县| 沙湾县| 临汾市| 武义县| 万年县| 修武县| 新丰县| 布拖县| 贵阳市| 林周县| 永善县| 陕西省| 乡宁县| 二连浩特市| 义马市|