国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

  Home>News Center>China
       
 

Rail stations to be linked by metro line
By Liu Weifeng (China Daily)
Updated: 2005-01-28 06:22

Visitors to Beijing will soon find it easier to shuttle between the capital's two major railway stations, thanks to a new railway link plan, officials said.

The news was reported by the Beijing Daily and confirmed to China Daily by the Ministry of Railways.

"The feasibility report has been completed and the design work for the line is being undertaken," said Wang Ming, an official with the planning department of the ministry.

Construction of a 9.16-kilometre-long underground transit line, connecting the Beijing Railway Station and Beijing West Railway Station is very likely to take place by the end of this year, said a source close to the National Development and Reform Commission.

The move is to ease on-ground transportation tension in the city's central area.

The two railway stations, one located south of Tian'anmen Square, right on the metro's loop line, another standing by one of the metro line, are in the urban centre.

Tens of thousands of passengers commute between the two stations every year, most of whom are migrant workers and long-distance travelers from the north of China to the south.

Because train transfers always take place at different stations, a national long-distance traveller arriving at Beijing Railway Station may very often have to commute to Beijing West Railway Station to depart on the second leg of a trip.

"I'm delighted to hear the news. It means I can finish the transfer between the two stations in just a few minutes," said Lu Yuan, a student at Guangzhou-based Sun Yat-sun University.

A native of Jilin Province, Northeast China, Lu said the transfer procedure between home and campus every vocation season was complicated.

About 2.08 billion yuan (US$253.6 million) will be allocated for the project, with each kilometre costing about 200 million yuan (US$24 million).

Seventy-two pairs of trains are set to run on the track each day by 2010, and another 13 pairs are expected to be added to the daily running schedule by 2015.

The construction is set to be completed by 2008.

In another development, with the construction of an electromagnetic train line starting soon, local residents will find it much easier to travel to the airport from their urban homes.

The 27-kilometre line, linking Dongzhimen station on the loop line of the metro with Capital International Airport, will shorten the trip to about 15 minutes.

It takes at least half an hour for Beijingers to drive to the airport now.

According to Liu Zhiyuan, general manager with China Railway Electrification Bureau (Group), the project is co-sponsored by five related companies, with investment of about 5 billion yuan (US$600 million).

It should also be in use by 2008.

(China Daily 01/28/2005 page3)



 
  Today's Top News     Top China News
 

World leaders mark Auschwitz liberation

 

   
 

Lenovo: IMB deal on despite challenges

 

   
 

Blood bank for pandas on the way

 

   
 

List of bribers helps corruption battle

 

   
 

"Shocking" number of student TB positive

 

   
 

Financial woes greet released hostages

 

   
  Financial woes greet released hostages
   
  A social security revolution in Guangxi
   
  Rail stations to be linked by metro line
   
  Minister pledges nine years schooling for all
   
  Fire ant menace faces dousing
   
  Chengdu police bust gun dealers
   
 
  Go to Another Section  
 
 
  Story Tools  
   
  News Talk  
  It is time to prepare for Beijing - 2008  
Advertisement
         
清徐县| 池州市| 奇台县| 康定县| 庆云县| 安新县| 房山区| 夏津县| 邯郸市| 珠海市| 鄂托克旗| 聂荣县| 东阳市| 扎囊县| 射阳县| 班戈县| 霸州市| 高青县| 洛扎县| 内丘县| 桐城市| 桂阳县| 靖边县| 陵川县| 曲阜市| 尼木县| 五大连池市| 宁国市| 肥城市| 合江县| 灵台县| 兰州市| 尚义县| 元氏县| 抚顺县| 莱阳市| 武城县| 兰考县| 新密市| 舞钢市| 青州市|