国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

CAD offers new landing path to reduce fuel costs

Updated: 2008-06-19 07:25

By Peggy Chan(HK Edition)

  Print Mail Large Medium  Small

To help the aviation industry save on fuel costs, the Civil Aviation Department (CAD) has made available a shortened flight path which will save minutes of flight time for flights landing at the Hong Kong International Airport (HKIA).

Director-General of Civil Aviation Norman Lo Shung-man said yesterday that as much as seven minutes of flight time can be saved.

 CAD offers new landing path to reduce fuel costs

A Cathay Pacific Boeing 777 taxing for take-off at the Hong Kong International Airport. File Photo

Lo reiterated that the standard distance between flights will remain the same under the new arrangement so as to ensure safety, and the original route will still be available for use should the new flight path is congested.

Meanwhile, the CAD has recently given the green light to some airlines to raise fuel surcharges.

Lo stressed that the approved increases are far less than what the airlines demanded.

He added it is likely that various airlines will apply for further increases when the CAD reviews the surcharges in August.

He said conducting a surcharge review on a monthly basis instead of once every two months which is the current practice will make it difficult for both the CAD and the industry to adapt to.

Meanwhile, Cathay Pacific Airways said the soaring oil price has drastically pushed up its operating costs.

"Fuel now constitutes over 40 percent of our operating costs," a spokesperson said.

The airline has yet to decide if it will appeal for higher fuel surcharges two months later.

In another development, Lo said the CAD will upgrade the city's navigation system in four years to cater for the increasing volume of air traffic.

Lo added whether there will be a third runway depends on the results of an assessment to be conducted by the Airport Authority.

The assessment, which will focus on the runway's impact on the environment, is scheduled to be completed by 2010.

Meantime, Lo revealed that over the past two months, the CAD has been conducting conferences and simulation tests to prepare for the Olympic equestrian events to be held in August.

The tests included the simulated landing of a flight with horses onboard, and the adoption of contingency measures under bad weather.

The tests will be completed by next month.

(HK Edition 06/19/2008 page1)

沙田区| 贡嘎县| 呼伦贝尔市| 乐至县| 尉氏县| 双辽市| 措美县| 江源县| 宜州市| 江山市| 仁寿县| 襄垣县| 孟州市| 齐齐哈尔市| 华宁县| 泗洪县| 彭山县| 出国| 松溪县| 镇原县| 辽中县| 高唐县| 子洲县| 抚顺市| 建德市| 建宁县| 天门市| 历史| 高青县| 富顺县| 西盟| 溧阳市| 青田县| 招远市| 抚州市| 汉川市| 岳阳市| 汨罗市| 枣阳市| 铅山县| 诸暨市|