国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

News >World

Japan begins air drop on stricken reactor

2011-03-17 14:21

Japan begins air drop on stricken reactor
A Japan Air Self-Defense Force CH-47 Chinook helicopter collects water from the ocean to drop on the reactors at the Fukushima Daiichi nuclear plant in Fukushima March 17, 2011. [Photo/Agencies] 

ZAO, Japan - Japanese military helicopters dumped loads of seawater onto a stricken nuclear reactor Thursday, trying to avoid full meltdowns as plant operators said they were close to finishing a new power line that could restore cooling systems and ease the crisis.

US officials in Washington, meanwhile, warned that the Fukushima Dai-ichi plant in northeastern Japan may be on the verge of spewing more radioactive material because water was gone from a storage pool that keeps spent nuclear fuel rods from overheating.

The troubles at several of the plant's reactors were set off when last week's earthquake and tsunami knocked out power and ruined backup generators needed for their cooling systems, adding a major nuclear crisis for Japan as it dealt with twin natural disasters that killed more than 10,000 people and left hundreds of thousands homeless.

A Japanese military CH-47 Chinook helicopter began dumping seawater on the damaged reactor of Unit 3 at the Fukushima complex at 9:48 am, said defense ministry spokeswoman Kazumi Toyama. The aircraft dumped at least four loads on the reactor, though much of the water appeared to be dispersed in the wind.

At least a dozen more loads were planned in the 40 minutes that each crew can operate before switching to limit radiation exposure, the ministry said.

The dumping was intended both to help cool the reactor and to replenish water in a pool holding spent fuel rods, Toyama said. The plant's owner, Tokyo Electric Power Co, said earlier that the pool was nearly empty, which might cause the rods to overheat.

The comments from US officials indicated there were similar problems at another unit of the Dai-ichi complex.

US Nuclear Regulatory Commission Chairman Gregory Jaczko said at a congressional hearing in Washington that all the water was gone from a separate spent fuel pool at the plant's Unit 4. Japanese officials expressed similar worries about that unit, but that it was impossible to be sure of its status.

Emergency workers were forced to retreat from the plant Wednesday when radiation levels soared, losing precious time. They resumed work after radiation levels dropped, but much of the monitoring equipment in the plant is inoperable, complicating efforts to assess the situation.

"We are afraid that the water level at unit 4 is the lowest," said Hikaru Kuroda, facilities management official at Tokyo Electric Power Co. But he added, "Because we cannot get near it, the only way to monitor the situation is visually from far away."

   Previous Page 1 2 3 Next Page  

Related News:

开阳县| 蚌埠市| 丁青县| 湟源县| 定日县| 临颍县| 阜南县| 藁城市| 嵩明县| 乐安县| 元朗区| 郁南县| 陵川县| 昭觉县| 集安市| 永顺县| 通辽市| 吉首市| 朝阳区| 于都县| 夏河县| 木兰县| 京山县| 桃园县| 友谊县| 新蔡县| 修文县| 清原| 金坛市| 田东县| 平安县| 衡水市| 浦江县| 荣成市| 洪江市| 余庆县| 叶城县| 喀喇| 保亭| 突泉县| 偏关县|