国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

USEUROPEAFRICAASIA 中文雙語Fran?ais
China
Home / China / China

Beijing subway woes should be fixed by year-end

By Jin Haixing | China Daily | Updated: 2013-10-29 07:16

Technicians promised to fix signal problems in Beijing's subway lines by the end of this year, following a string of signal malfunctions that have stranded many commuters recently.

During the Monday morning rush hour, several train shifts on Line 5 were delayed because of a signal failure.

Beijing Mass Transit Railway Operation Corp, the operator of Line 5, had warned passengers about the problems on its micro blog.

Monday's incident was the seventh time that a signal malfunction has occurred on the city's subway lines this month.

Zhang Yanbing, a senior engineer at the equipment department of Beijing MTR Construction Administration Corp, which has built or helped build the city's newest subway lines and extensions, said the signal problem on Line 5 on Monday was an accidental one and had little effect.

But she said she does not believe the same is true with the other signal malfunctions.

Among those six signal breakdowns this month, five occurred on Line 10, with the latest on Thursday.

Thursday's signal failure happened between the Shuangjing and Guomao stations. Services returned to normal after temporary measures were taken.

The effect rippled throughout Beijing's subway network, as Line 10 connects more than 10 other subway lines. The line had 1.95 million trips on a single day last week.

Zhang, who leads a team of signal testers, said on Monday that the malfunction was caused by a wireless signal software bug, which was found after a software upgrade. The problem was corrected by returning to a previous version of the software.

"The work of signal system upgrading and testing on Line 10 is still underway," she said. "We will try to fix all possible signal problems at the end of the year."

Jia Peng, a spokesman for the operator, said on Sunday that the malfunctions were not surprising since Line 10 was still working out problems related to the completion of the line as a full circle.

Line 10's phase two was put into use in May, which enabled the whole line to operate in a circle. It is Beijing's second subway loop line and the longest line in the city at 57 km and 45 stations, according to the transport authority.

Zhang said the line's complicated operation system posed a challenge to the signal engineers.

Some trains on Line 10 make the full loop, while others run only in sections. The operation arrangement is due to the limited numbers of trains available, she said, adding Line 10 now has 76 trains in service, though a full-circle operation for all shifts needs at least 100 trains.

The operator needs to build the planned parking area in the Songjiazhuang station area, which had its construction hindered due to disputes, to make more subway trains available on the line, she said.

Editor's picks
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
汕尾市| 金华市| 林周县| 蓝山县| 克东县| 江孜县| 汝州市| 密云县| 乐业县| 双辽市| 双柏县| 呼玛县| 临夏市| 仙游县| 西乡县| 鸡西市| 桂平市| 顺义区| 德兴市| 乡城县| 扎鲁特旗| 营山县| 兴城市| 会同县| 漾濞| 亳州市| 陇南市| 霸州市| 福州市| 宁陵县| 名山县| 商南县| 寻甸| 盐山县| 金山区| 鹤壁市| 株洲市| 雅安市| 思南县| 安多县| 思茅市|