国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

USEUROPEAFRICAASIA 中文雙語Fran?ais
China
Home / China / China

Underground water treatment plant to make waste useful

By Wang Xiaodong | China Daily | Updated: 2016-05-23 08:29

The largest underground water recycling plant in Asia is expected to be completed in Beijing by the end of June, according to the Beijing Drainage Group, a large public-service enterprise in the capital and the operator of the plant.

The Huaifang Water Recycling Plant, which will be capable of recycling 200 million cubic meters of sewage a year and able to treat most wastewater from Beijing's western urban area, will contribute greatly to the city's environmental protection, according to the city's publicity department.

The facility, which is located in the capital's southwest, was built underground to save valuable land. It occupies an area of more than 16 hectares and is equipped with cutting-edge technology, the group said.

The plant will be used to treat both industrial and household wastewater and transform it into water that reaches environmental protection standards. The recycled water will be used for industrial and commercial purposes in nearby areas and also to replenish nearby waterways.

In addition, a wetland park of the same size as the underground water treatment plant will be built on the surface. The park will be fed by recycled water from the plant, the group said.

Wastewater flowing into the plant will be treated in various ways, which will include filtration, biological degradation of chemicals and sterilization with ultraviolet rays, said Wang Yabin, an electrical engineer involved with the project.

The development was the largest water treatment project among several listed in a three-year plan released by the Beijing municipal government in 2013.

The capital is short of water, with per-capita resources only standing at about 150 cubic meters, far less than the national average, according to the government.

Last year, an additional 1 billion cubic meters of fresh water was supplied to Beijing through the south-north water diversion project, a massive program to divert water from the Yangtze River to North China.

Under a plan for wastewater treatment and reuse facilities that was released by the city in January, Beijing will build 27 new water recycling plants and install and upgrade 1,081 kilometers of sewage pipelines during the next three years.

wangxiaodong@chinadaily.com.cn

Underground water treatment plant to make waste useful

Workers at the construction site of the Huaifang Water Recycling Plant in Beijing's Fengtai district. Hao Yi / For China Daily

Editor's picks
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
淮安市| 都兰县| 山东省| 营口市| 永登县| 濉溪县| 英超| 浏阳市| 赤峰市| 大埔县| 呼玛县| 曲靖市| 永清县| 竹溪县| 子长县| 福清市| 洛扎县| 友谊县| 田东县| 于田县| 延吉市| 蕲春县| 左贡县| 天祝| 洞头县| 临湘市| 社会| 莱西市| 株洲市| 德格县| 和静县| 石林| 肇源县| 巢湖市| 长乐市| 罗甸县| 海原县| 宁晋县| 土默特右旗| 北流市| 仁怀市|