国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

 
Home> Local

Subway Line No.1 to begin tunneling in August

( m.hwdly.com.cn )

Updated: 2012-05-09

The construction of Fuzhou Subway Line No.1 is to have entered the critical stage.

The planned Subway Line No.1 is 29.2 kilometers long. The beginning station of phase one of Line No.1 is Xiangfeng Station, and the terminal station is Fuzhou South Railway Station. The operating line is about 24.89 kilometers, and 21 stations are planned along the line.

Except Tieluohanshan station, Fuzhou Railway station, Dadao station, Shangteng station, and Lulei station, where the work of relocation has not been started, all other stations have started construction; and 14 stations have entered the stage of main work construction.

Huluzhen station begins full excavation and foundation laying

According to the relevant person of the construction company, the main structure of Huluzhen station is 195 meters long and 17.8 meters wide. It has three entrances and exits. The construction is carried out in two phases. Phase one involves the construction of the main structure, No. 1 and No. 3 entrances and exits, and No. 1 ventilation pavilion; and phase two involves the construction of No. 2 entrance and exit.

According to the person in charge, Huluzhen station and Huangshan station began fencing and construction in June of 2011. In January 2012, both stations completed the construction of the underground diaphragm walls and are excavating the station foundation pits. The excavation of foundation pit at the Huluzhen station is in full swing and the deepest point is 8 meters deep.

松阳县| 孟州市| 英吉沙县| 海晏县| 古浪县| 佛山市| 阜宁县| 平山县| 博湖县| 修武县| 旅游| 南雄市| 丰城市| 运城市| 墨竹工卡县| 普安县| 伊川县| 吉木乃县| 昆明市| 乌拉特前旗| 宜良县| 河津市| 桂阳县| 历史| 兴国县| 张掖市| 无锡市| 遵义县| 平泉县| 连城县| 阳山县| 延川县| 庆安县| 光山县| 米林县| 若羌县| 当涂县| 栖霞市| 邵阳市| 苍梧县| 鲁甸县|