国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

 
Home> Government Bulletin

Pingtan leader inspects railway construction

( chinadaily.com.cn )

Updated: 2015-03-11

  Print Mail Large Medium  Small 0

Li Dejin, director of Pingtan’s administration, conducted an inspection tour of a railway project on Xiaolian Islet in Pingtan on March 3.

Li urged safety and quality of construction after investigation following the inspection.

Xiaolian Islet is one of many stops of the 16.3-km cross-sea railroad bridge that links Changle county and Pingtan county. The cross-sea rail link will start from Songxia Port in Changle; stretch southeast over the Yuanhong channel, the Guyumen channel, Changyu Island, Xiaolian Island, the Xiaolian-Dalian island channel, Dalian Islet and Haitan Strait; and finally reach Suao town on Pingtan Island.

The bridge is part of the 88-km Fuzhou-Pingtan Railway.

Background: Fuzhou-Pingtan Railway

Construction of the Fuzhou-Pingtan Railway – which will link the capital city of Fuzhou and the island county of Pingtan in Fujian province – began on Oct 31, 2013.

The line stretches 88.4 kilometers, with a designed speed of 160 km per hour (Fuzhou-Fuzhou South) and 200 km per hour (Fuzhou South to Pingtan), a passenger capacity of 50 million and cargo capacity of 15 million tons.

The railway project – with a total accrued investment of 26.8 billion yuan ($4.4 billion) – is expected to take over five years.

吴川市| 扶绥县| 嘉荫县| 呼和浩特市| 鱼台县| 凌源市| 南江县| 建昌县| 乃东县| 日照市| 嘉峪关市| 来凤县| 澜沧| 南阳市| 皮山县| 洮南市| 潜江市| 申扎县| 嘉定区| 郁南县| 高台县| 安泽县| 新泰市| 年辖:市辖区| 新昌县| 景洪市| 古交市| 黄山市| 汨罗市| 巴楚县| 连南| 抚宁县| 射阳县| 枣庄市| 卢氏县| 通山县| 宁南县| 鹤庆县| 浪卡子县| 阿克陶县| 罗城|