国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

 
 

Home/News

1st turbine-generator unit of Jinghong HPP put into operation

Updated: 2008-07-02

( gzbgj.com )

As one of the Contractors, CGGC is responsible for the works such as access road on left bank, left abutment excavation, civil works and metal structure installation of the dam on right bank, bank protection and river dredging at downstream of left bank, auxiliary powerhouse, excavation and support of berthing area and mooring dolphin on the upstream of left bank, civil, metal structure and E & M installation of navigation structures. Jinghong HPP is the fastest built HPP of the same size in the world.

Locating in Jinghong, Xishuangbanna Dai autonomous prefecture, Yunnan, Jinghong HPP is designed with maxi height of 108 meters, total crest length of 704.5 meters and total installed capacity of 1750MW (5*350MW).

As one of the backbone projects of Western Region Development Strategy and West-to-east Power Transmission, Jinghong HPP was started in 2003, river-closed in 2005 and plans to have all the units put into operation by 2009.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

郑州市| 北辰区| 定结县| 双桥区| 清丰县| 高阳县| 冕宁县| 石楼县| 玉林市| 河间市| 乡城县| 准格尔旗| 平谷区| 丰都县| 正定县| 高青县| 礼泉县| 稷山县| 南安市| 石屏县| 五台县| 上饶市| 乐山市| 家居| 宁德市| 隆安县| 昭通市| 托里县| 阳曲县| 崇明县| 炎陵县| 重庆市| 红河县| 库车县| 柯坪县| 鄯善县| 杭锦后旗| 梅河口市| 大悟县| 赣州市| 瑞昌市|