国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

 
 

Home/News

Construction progress of Malian Bridge Project commended by client

Updated: 2009-10-25

On Oct 22, 2009 local time, Ahmed Diane Semega, the Malian Minister of Equipment and Transportation, commended the rapid progress of Bamako No 3 Bridge in the recent time when heading a group to visit the construction site.

At about 11:00 am, the group first arrived at the construction site of the south bank prefabrication plant for the bridge project, understood the steel bar structures of hollow plate girders and T girders, watched the tension process of the hollow plate girders on the site, and asked the technical team in detail about the preparation of staff, equipment and materials.

Seeing piles had risen from the ground, prefabricated girders had been piled in large quantities on both banks, and the construction of the roadbed refilling section on both ends of the bridge was going on stressfully, Mr Semega was very glad. He sincerely appreciated the hard work of the CGGC construction staff, and hoped that they would continue the effort to finish half of the bridge prior to the National Day of Mali in September, 2010 and deliver the entire project on schedule.

The head of the Malian technical team of CGGC vowed that all the staff of the technical team would elaborately organize the construction and carry out the scientific construction to ensure all objectives of different stages were accomplished on schedule.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

莱西市| 新民市| 太保市| 汽车| 安多县| 凤凰县| 庐江县| 林西县| 景洪市| 罗田县| 泗阳县| 布尔津县| 皮山县| 竹溪县| 昔阳县| 南丹县| 杭锦后旗| 阿拉尔市| 仙桃市| 鄂伦春自治旗| 绥芬河市| 洛川县| 宿迁市| 永登县| 福安市| 普兰县| 绥滨县| 普宁市| 昌江| 嘉定区| 佛山市| 化隆| 富阳市| 柳江县| 清水县| 交城县| 万载县| 祁阳县| 商南县| 东乌| 东港市|