国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

 
 

Home/News

Mali Minister of Equipment and Transportation inspects Bamako No 3 Bridge Project

Updated: 2010-05-12

Ahmed Diane Semega, the Mali minister of equipment and transportation, inspected the construction site of Bamako No 3 Bridge, accompanied by the Chinese Ambassador Zhang Guoqing in Mali, Counselor Liu Qi of the Economic Counselor’s Office and relevant executive of the technical group of the Bamako No 3 Bridge of CGGC Second Engineering Co.

It is the second time Ahmed Diane Semega has inspected the bridge three months after his visit. When knowing the Chinese and Mali engineers and technicians completed the construction of the first continuous box girder through the close cooperation, he felt very satisfied with the construction progress.

Semega noted the Mali government and all circles of the society paid much attention to the construction progress of the bridge. So far, the media and social public opinion in Mali have highly commended the bridge project.

Semega said he himself was very satisfied with the construction progress, construction quality and safety work of the bridge project. He extolled the CGGC Bamako No 3 Bridge Project Department had a very excellent team, and implemented the scientific and effective site management. It is said that the Bamako No 3 Bridge Project was scheduled to fulfill the single-breadth opening at the end of this September, and the entire project was scheduled for completion in February, 2012.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

咸宁市| 平泉县| 绥化市| 西峡县| 丰城市| 抚宁县| 鲁甸县| 横峰县| 正蓝旗| 黄龙县| 衡阳市| 肃宁县| 衡南县| 彩票| 来宾市| 乾安县| 德江县| 常山县| 正宁县| 许昌市| 都兰县| 罗源县| 岗巴县| 甘南县| 定安县| 乐东| 涡阳县| 雷波县| 吕梁市| 宜黄县| 泸州市| 台北市| 徐汇区| 庆云县| 万源市| 平凉市| 密云县| 包头市| 赣榆县| 霍邱县| 邵武市|