国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

 
 

Home/News

CGGC and South Sudan sign a contract for the Biden Hydropower Station Project

Updated: 2012-02-02

On Jan 20, CGGC and the Ministry of Electricity and Dams of South Sudan signed a contract in Beijing for the Biden Hydropower Station Project.

Representatives from the Ministry of Electricity and Dams of South Sudan, South Sudan Power Corporation and CGGC participated in the signing ceremony.

CGGC and South Sudan sign a contract for the Biden Hydropower Station Project

The Biden Hydropower Station is located on River Bahr al-Jabal, a section of the Nile River between Nimule and Juba, Equatorial State, South Sudan, 30 kilometers away from Juba, the country’s capital.

With a total installed capacity of 540 MW, the project, in the form of an EPC turn-key contract, includes construction of power houses, diversion dam blocks, concrete spillway dams, dam blocks with concrete bottom and outlets, non-spillway dam blocks and concrete faced rock-fill dams. With a construction period of 80 months, the project is expected to fundamentally remove the power supply bottleneck in South Sudan after completion.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

德令哈市| 江都市| 湘潭县| 仙桃市| 寻乌县| 澎湖县| 鄂伦春自治旗| 六盘水市| 灵山县| 太仓市| 丁青县| 五河县| 昭苏县| 宿州市| 静宁县| 渑池县| 喀喇沁旗| 南岸区| 山东| 建始县| 铜川市| 杭锦后旗| 麟游县| 阿鲁科尔沁旗| 西贡区| 北安市| 辉县市| 宝鸡市| 成安县| 建瓯市| 郴州市| 稻城县| 伽师县| 车险| 扬中市| 竹溪县| 南澳县| 自治县| 昭通市| 宜君县| 乐都县|