国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

 
 

Home/News

CGGC wins the project of Wudongde spillway tunnel

Updated: 2013-10-07

On Sep 29, CGGC won the construction project of section I of the civil construction and installation of metal structure of the spillway tunnel of Wudongde Hydropower Station.

The project, with the construction of the spillway tunnel and the tailrace as the key, will start from October 2013 to June 30, 2019, lasting a total of 69 months.

Located at the Wudongde Hydropower Station on the border between Luquan County (Kunming City, Yunnan Province) and Huidong County of Sichuan Province, it is the first one of the four cascades at the lower reach of the Jinsha River.

The power station has a total installed capacity of 10.2 gigawatts and is expected to be put into operation in 2020. Upon completion, the project will play a role in power generation, flood control, shipping and sediment storage, etc., and is of strategic importance to the economic & social development of Sichuan and Yunnan and the project of “West-East Power Transmission”.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

襄垣县| 韶山市| 南漳县| 陆河县| 抚州市| 抚顺县| 延边| 永昌县| 湖口县| 黔南| 舞钢市| 五家渠市| 武汉市| 海原县| 虎林市| 会同县| 阿瓦提县| 湖口县| 什邡市| 库尔勒市| 漳平市| 蒙山县| 山丹县| 龙岩市| 竹山县| 思南县| 和田市| 鄂尔多斯市| 阿图什市| 西丰县| 怀远县| 十堰市| 嵩明县| 稷山县| 二连浩特市| 安龙县| 延安市| 富川| 农安县| 尚志市| 绥中县|