国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

 
 

Home/News

Contract signed by CGGC for Hydropower Stations on the Santa Cruz River in Argentina

Updated: 2013-11-15

In El Calafate, Santa Cruz province, Argentina on Oct 31, CGGC officially signed a contract with the country’s Department of Federal Planning, Public Investment and Services for the Finance, Design, Construction and 15-year operation & maintenance of President Nestor Kirchner Hydropower Station and Governor Jorge Saipan Nick Hydropower Station on the Santa Cruz River.

The project's total installed capacity is 1.74 million kilowatts, where six Francis turbines will be installed for the President Power Station to reach a generating capacity of 1.14 million kilowatts and five axial-flow hydraulic turbines will be installed for the Governor Power Station to achieve a generating capacity of 600,000 kilowatts.

When completed in 66 months, the project, as one of the country's national key projects, will not only be able to provide strong power for Argentina's economic and social development but also enable her to export electricity to neighboring countries that are suffering from power shortage. So far, it is the largest overseas project ever undertaken by Chinese companies, exceeding the NJ Project in Pakistan in terms of construction scale.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

偃师市| 日土县| 澎湖县| 姚安县| 凤凰县| 通化市| 洛浦县| 九江市| 四子王旗| 若羌县| 万盛区| 黑龙江省| 融水| 洛阳市| 民丰县| 万载县| 定日县| 黄浦区| 平果县| 彩票| 南乐县| 靖州| 光山县| 芒康县| 乌拉特前旗| 富蕴县| 凤阳县| 增城市| 宾川县| 历史| 苍南县| 惠州市| 镇雄县| 长阳| 车险| 庆安县| 石城县| 安陆市| 东莞市| 德江县| 宝鸡市|