国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Home|Contact|Members|中文|
Search
Home > Transmission and Distribution

Overseas Business

T&D Planning, Investigation, Design and Consultation

Updated: 2013-06-25

2) UHV converter station design

T&D Planning, Investigation, Design and Consultation

Areial view of±800-kV UHV Xiluodu (Shuanglong) converter station

T&D Planning, Investigation, Design and Consultation

±500-kV Deyang converter station, Sichuan province, put into operation in 2009.

3) UHV substation design

T&D Planning, Investigation, Design and Consultation

 

The Jindongnan- Nanyang- Jingmen 1,000-kV UHVAC transmission line is China's first transmission project of its kind, with a total length of 654 km and a 3.65-km span across the Yellow River and 2.96 km across the Hanjiang. It went into service in 2009 and won the National Quality Engineering Gold Medal the same year.

4) UHV substation design

T&D Planning, Investigation, Design and Consultation

The Xiangjiaba – Shanghai ±800-kV UHVDC transmission pilot project was China's first UHVDC transmission project and currently carries the highest DC voltage and is the most advanced DC transmission project in the world. The line is 1,891.6 km long and crosses the Yangtze River four times. It has a conversion capacity of 6,400 MW at 4,000 A DC. It went into operation in 2010 and won the National Quality Engineering Gold Medal for 2011.

Previous Page 1 2 Next Page

龙江县| 永川市| 济源市| 平度市| 绍兴县| 永登县| 封丘县| 石嘴山市| 茶陵县| 手机| 曲阜市| 广宗县| 利川市| 元朗区| 颍上县| 黔西县| 寻甸| 德清县| 兴仁县| 镇宁| 常熟市| 雷州市| 略阳县| 固安县| 遂昌县| 咸丰县| 湄潭县| 华宁县| 策勒县| 台南市| 万全县| 徐州市| 宣城市| 南康市| 新余市| 定陶县| 确山县| 三门峡市| 云安县| 广元市| 松潘县|