国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

USEUROPEAFRICAASIA 中文雙語Fran?ais
Opinion
Home / Opinion / Hot Words

港珠澳大橋主體貫通(gǎngzhūào dàqiáozhǔtǐ guàntōng):Completion of the main structure of the Hong Kong-Zhuhai-Macao Bridge

China Daily | Updated: 2017-07-10 07:44

With the finishing of its undersea tunnel, the main structure of the world's longest sea bridge, which links Hong Kong, Zhuhai and Macao, was completed on Friday. The 40-meter-deep undersea tunnel creates a gap in the bridge to allow cargo ships to pass through into the Pearl River Delta.

A Y-shaped bridge, the main structure is 29.6 kilometers in length, consisting of a 22.9-km bridge section and 6.7-km underground tunnel. The total length of the bridge is 55 kms.

It consumed 420,000 tons of steel, enough to build 60 Eiffel Towers, and 1.08 million cubic meters of cement.

The Hong Kong-Zhuhai-Macao Bridge is due open to traffic at the end of this year. It will cut travel time between Hong Kong and Zhuhai from three hours to just 30 minutes, further integrating the cities in the Pearl River Delta.

It has taken seven years to build, at an estimated cost of $10.6 billion.

The project is part of the plan to develop the Guangdong-Hong Kong-Macao Greater Bay Area.

Most Viewed in 24 Hours
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
汝州市| 浦县| 绥滨县| 克东县| 高邮市| 中西区| 昭觉县| 南汇区| 清镇市| 锡林郭勒盟| 浦江县| 尼玛县| 枝江市| 东光县| 固始县| 元谋县| 新建县| 长寿区| 武强县| 凤阳县| 增城市| 当雄县| 邢台县| 宁化县| 尼木县| 尉犁县| 巴彦淖尔市| 德格县| 韩城市| 富川| 深州市| 明水县| 丰都县| 盐源县| 石泉县| 时尚| 永定县| 高要市| 巫溪县| 海口市| 南岸区|