国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Global EditionASIA 中文雙語Fran?ais
China
Home / China / National affairs

Public comment sought on Beijing-Xiongan high-speed rail

By Luo Wangshu | China Daily | Updated: 2017-07-24 06:37
Share
Share - WeChat

Planners release environmental impact assessment for 100.3-kilometer corridor

An environmental impact assessment for a new high-speed railway linking Beijing and Xiongan New Area was released on Saturday. It was the first public acknowledgment that a new line will be built.

China Railway Design Corp announced the assessment on its website and is seeking public comment.

According to the notice, the Beijing-Xiongan railway will start at Liying in Beijing's Daxing district, pass through Langfang and terminate at Xiongan East Railway Station-a total length of 100.3 kilometers.

The new line will also pass through the capital's new airport, which will be about 36 km from Liying and about 64 km from Xiongan New Area. The airport is expected to open in 2019.

The existence of a railway plan was reported in April by Tianjin News. According to the report, a planning map showed two railway stations in the new area-Xiongan Railway Station and Xiongan East Railway Station. The environmental assessment covers the latter.

According to an earlier report, the Tianjin-Xiongan railway route will connect the area with Tianjin's new railway station, which is also in the planning stages.

An older rail line is already in operation. Passengers must transfer in Baoding or Tianjin to get to the Xiongan area on high-speed rail.

Since July 7, four daily high-speed railway services have been started. The journey takes one hour and 50 minutes.

The new Beijing-Xiongan line follows a different route.

Xiongan New Area is located in the center of a triangular area defined by Beijing, Tianjin and Shijiazhuang, capital of Hebei province.

Located about 100 km southwest of downtown Beijing, the new area will mostly cover Xiongxian, Rongcheng and Anxin counties in Hebei.

It will eventually encompass 2,000 square kilometers, with a population of up to 2.5 million people.

Under the area's development plan, a major transportation network should be in place in Xiongan by 2020. The area will be well connected to Beijing, Tianjin and other cities in Hebei by 2022, when the Winter Olympic Games will be held.

Xiongan New Area is intended to house the bulk of Beijing's noncapital functions, including some administrative and public institutions, company headquarters, financial institutions, higher education institutions, and science and technology units.

Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
安岳县| 阿克陶县| 布尔津县| 凤庆县| 卢氏县| 洪洞县| 九龙县| 永和县| 灵川县| 涿州市| 遂平县| 治多县| 德安县| 林芝县| 缙云县| 广汉市| 井陉县| 东明县| 达孜县| 海城市| 石首市| 金沙县| 高阳县| 通化县| 聊城市| 从化市| 平武县| 山丹县| 大田县| 蒙山县| 邻水| 伽师县| 昔阳县| 宁国市| 咸宁市| 锦屏县| 安岳县| 绥阳县| 咸阳市| 息烽县| 东方市|